/machines/1RB0RE_1RC0RA_0LD0RB_1LA0LE_1LC1LF_0LC---/rocq/log.md · raw

W5-5 halting proof: formalization log

Round 1 (2026-10-13)

Plan followed: rocq-plan.md (C2-552-style checked certificate runner, no flip, generic run-length macro simulator with concrete N counts). ES_v3 was not needed: the own simulator and its soundness proofs compiled on the first full attempt after five small proof fixes.

Files

Design as built (differences from the plan)

Results

Call-only variant (fallback, not in the kill file): dev/W55b.v

Cross-check against the independent model

check_kill (round 1): PASS