{
 "tm": "1RB0LD_0RC---_0RD0RF_1LE0LA_1LF1LE_1RA0RD",
 "bucket_reason": "W6-6 recorded a priority call in status.json; filed as a decision card (2026-10-14).",
 "question": "W6-6 looks cryptid-like (b' = 9b/4 + c with an 8-way remainder split): park it, or fund one 2 h stage?",
 "options": [
  {
   "id": "park",
   "label": "Park as a cryptid candidate",
   "consequence": "Costs nothing. The exact rules (GR, GL, S1, G36) stay in the folder."
  },
  {
   "id": "fund",
   "label": "Fund a 2 h stage",
   "consequence": "An exact cycle accelerator plus a census of junk shapes, to look for closure. Stop rule: park if the branches do not close."
  }
 ],
 "recommended": "park",
 "rationale": [
  "Field law b' = 9b/4 + c, where b mod 8 picks the branch and c depends on the junk.",
  "No halting branch is known; this is the pre-registered cryptid stop."
 ],
 "evidence": [
  {
   "kind": "fact",
   "text": "Full call and evidence: notes.md",
   "href": "notes.md"
  }
 ],
 "effort_if_yes": "one 2 h stage, 1-2 light processes",
 "updated": "2026-10-14",
 "answer": {
  "option": "park",
  "note": "",
  "date": "2026-10-14"
 }
}